HVAC equipment for the expansion of Nyhamna onshore plant

Delivery year 2014- 2015
Project name Expansion Nyhamna
Concept Onshore plant
Operator/ client Norske Shell

Callenberg supplied HVAC equipment to the ongoing expansion of Nyhamna Onshore Plant, one of the largest onshore contracts in Norway.

Nyhamna is the gas processing facility for ORMEN LANGE. This is where gas comes in from the field, treated in a huge complex for a period of only 10 minutes, then exported through a 1200 km subsea pipeline, called Langeled, to Easington in south England. Nyhamna makes Norway the 2nd largest gas exporter in the world, after Russia.

Despite being an onshore facility, Nyhamna is subject to offshore standard rules and regulations, specifications, materials and documentation. Callenberg's HVAC experience in complex offshore projects was a significant advantage in winning this project.

Callenberg's scope of work included detailed equipment design, procurement and delivery:

http://callenberg.com/wp-content/uploads/2015/01/nyhamna-e1422216932373.jpg

  • Roccheggiani air handling units
  • Fans
  • Water chiller units
  • Dry coolers
  • Pump skids
  • Self contained units
  • Fan coil units
  • Electric heating coils
  • All types of dampers
  • Field instruments
  • Weather louvers
  • Acoustic louvers
  • Deaerators
  • Measuring devices
  • Valves
  • Thyristor panels